Flow system project experience

Calibrated network models and surge studies across refining, power, water and building systems, described by the system and the result.

Discuss your system

All projects on this page were performed by our team members before FSPG was formed. Clients, facilities and locations are not named.

Pipe rack and process column at an industrial plant

Gulf Coast refinery cooling-water calibration

125+
heat exchangers served by the network
700+
field measurements compared with the model

Challenge. An extensive cooling-water piping network at a major Gulf Coast refinery, with more than 125 heat exchangers drawing from it.

Approach. A hydraulic model of the full network, compared against more than 700 field measurements of pressure, flow and temperature.

Findings. Close agreement between measured and modeled flow and pressure conditions across the system.

Value. A calibrated model the refinery can use to test system changes before committing to them.

More project experience

Eight further studies, from island energy and gas-turbine fuel systems to a high-rise chilled-water network.

Three large steel pipelines running downhill through forest

Have a similar system?

If one of these projects sounds close to what you are dealing with, say which one when you get in touch. It is a quick way to set the starting scope.